The World Bank has disbursed $361.13 million out of the $500 million allocated to Jordan’s Electricity Sector Efficiency and Supply Reliability Program, while cost savings and additional revenues generated by the National Electric Power Company (NEPCO) have risen to JD 188.39 million.
اضافة اعلان
According to a World Bank report reviewed by Al-Mamlaka, the disbursement rate reached approximately 72.2%. The program maintained a “satisfactory” rating for progress toward achieving its development objectives and for overall implementation, reflecting improvements in electricity sector efficiency despite ongoing financial sustainability challenges.
The program’s funding is divided into two loans of $250 million each. The first was approved in March 2023, while additional financing was approved in April 2025. The Bank has disbursed the full amount of the first loan and $111.13 million from the additional financing, representing a disbursement rate of 44.45%. Approximately $138.88 million in funding remains undisbursed.
Implementation is scheduled to continue until the end of February 2028. The program aims to improve electricity sector efficiency, reduce costs, increase revenues, maintain reliable electricity supplies and renewable energy integration, strengthen NEPCO’s governance, and improve the management of financial risks in the sector.
Financial Savings and Additional Revenues
The report showed that NEPCO’s cost savings and additional revenues indicator increased by 17.8%, rising from JD 159.92 million in the April assessment to JD 188.39 million in September, an increase of JD 28.47 million.
The World Bank noted that an adjustment to the wholesale electricity supply tariff for NEPCO generated savings of JD 16.9 million during the second half of 2025. The company has also continued to receive monthly mining-related revenues due to it from the Attarat project.
The program aims to generate JD 155 million in cost savings and additional revenues for the company in 2027, under a results-based target linked to a $20 million financing allocation.
Renewable Energy and Supply Reliability
Renewable energy accounted for 27% of Jordan’s electricity supply mix last September, exceeding the program’s minimum target of 26%.
Electricity supplied by renewable energy projects connected to the transmission grid increased by 12.6% during the first half of this year, reaching 2,333.52 gigawatt-hours, compared with 2,072 gigawatt-hours during the same period in 2025.
The indicator measuring the number of electricity service interruptions per subscriber also declined by 32.4% compared with the end of 2022. It reached 0.23 in September, down from 0.34 at the end of 2022, remaining below the target ceiling of 0.5.
New Generation Capacity
The World Bank revealed that NEPCO and the Ministry of Energy and Mineral Resources have begun procedures to secure 1,600 megawatts of additional electricity generation capacity.
The planned capacity includes two combined-cycle gas turbine generation units with a total capacity of 1,400 megawatts, in addition to 200 megawatts of solar photovoltaic power.
The projects fall under NEPCO’s 2023 master plan and are part of efforts to increase the share of renewable energy in Jordan’s electricity supply mix to at least 31% by 2030.
Financial Sustainability
The report showed that the proportion of outstanding balances from advances provided by the Ministry of Finance and loans from the Ministry of Planning and International Cooperation to NEPCO, as recorded at the end of 2022, that have been converted into the company’s equity rose from 15% at the end of 2025 to 20% at the end of June 2026. The target is 30% by the end of 2027.
Despite the progress, the World Bank classified this indicator, along with the regularity of payments by entities funded through the state budget for their electricity bills, as being off track.
The report highlighted continuing financial sustainability challenges facing NEPCO, noting that its accumulated losses amount to several times its capital. This has raised substantial uncertainty regarding the company’s ability to continue operating.
The World Bank classified five of the program’s ten financing-linked indicators as achieved, two as partially achieved, and two as off track. The deadline for the remaining indicator has not yet arrived.
The Bank maintained the program’s overall risk rating at “Substantial,” despite progress in implementation and the achievement of its development objectives.